1000l brewing equipment
System 1 : 1000l brewing equipment---brewhouse
Outline size: Φ1360*2400 100% TIG welding with pure argon gas shield *Inner(SUS304)thickness: 3.0 mm; Inner bottom 3.0 mm *External thickness: 2.0mm; end socket: thickness: 3.0 mm. *Insulation: Polyurethane-thickness: 80mm. *Heating way : Steam heating , steam jacket area 1.3㎡ *Equipped with mixer, Alterable frequency * Variable frequency motor ; Power: 1.5KW |
System 2: Steam generator
Steam generator description:
Rated Evaporation:100 Kg/h Thermal efficiency(%) ≥ 93 Steam temperature 175°C Fuel : Natural gas Water volume: ≤ 50L Size: 880*850*1750mm Weight: 500KG |
System 3: fermentation tanks
Size: Ф1460*2500 Inner:SS304.TH=3.0mm Outer:SS304.TH=2.0mm 100% TIG welding with pure argon gas shield Interior Finish: Overall polishing to 0.4 μm without dead corner Insulation: Polyurethane; TH=80mm Glycol Jacket: Ice water belt cooling jacket Dished head and 60 degree cone bottom Top Manhole: φ330*430mm. Full sanitary sampling valve_Perlic Style Shockproof pressure gauge on CIP arm 4pcs completely SUS304 heavy duty legs with leveling pad and legs support |
System 4: Cooling system
The glycol tank and refrigerator
Size: Ф1860*3000 Inner:SS304.TH=3.0mm Outer:SS304.TH=2.0mm 100% TIG welding with pure argon gas shield Interior Finish: Overall polishing to 0.4~0.6 μm without dead corner Insulation: Polyurethane; TH=80mm Top Manhole:600*600 4 pcs completely SUS304 heavy duty legs with leveling pad 2 sets Glycol water inlet and outlet |
System 5 :CIP system
System 6: Control system
System 7: malt crusher
Note:
1.The shipping time is 40-45 working days. 2. Packing: Wooden box, Iron flame, PE paper. 3.Payment: Advance payment 30% deposite through T/T, the rest should be paid before shipment. 4.3 year warranty, life long oversea service. |